Overview

Enterprise data center design, implementation and management — power, cooling, racking, virtualization, DR. Tier III and Tier IV facilities.

Even cloud-native companies need data centers somewhere. We design and operate facilities that meet Tier III/IV standards, with the kind of runbooks and hand-offs that make 3am calls boring.

Discuss this service All services
Enterprise data center server racks
Capabilities

What we do.

End-to-end coverage across the data center solutions discipline. Pick any subset; we'll build a scope around it.

01

Infrastructure design

Power, cooling, structured cabling, hot/cold aisle, fire suppression.

02

Virtualization

VMware · Nutanix · Proxmox · KVM — production-grade.

03

Disaster recovery

Cross-site replication, runbook-driven failover, tested quarterly.

04

Colocation

Cabinet, cage and suite options across regional facilities.

05

Edge data centers

Micro and modular DCs for distributed workloads.

06

Migration

Lift-and-shift between facilities with minimal downtime.

Process

How we deliver.

The same engineers stay through every phase. No throw-it-over-the-wall handoffs between scoping and operations.

Capacity model

Workload sizing, power/cooling/space envelope, growth curves.

Design

Topology, redundancy class, vendor selection, BoM.

Build

Construction, M&E commissioning, structured cabling, smoke tests.

Migrate

Move groups, dependencies, sequenced cutover, rollback gates.

Operate

Change management, capacity reviews.

Specifications

By the numbers.

Defaults we plan to. Every engagement has its own targets — these are the floor, not the ceiling.

Tier ratingTier III · Tier IV (Uptime Institute aligned)
PUE target1.3 – 1.5
DensityUp to 30 kW/rack (liquid-assisted)
CoolingCRAC · in-row · rear-door heat exchanger · DLC
Power2N redundant · diesel + UPS · ATS
ComplianceISO 27001 · SOC 2 · PCI

Ready to scope
data center solutions?